Inicia Sesión Registra tu Negocio Gratis

NATURAL GAS PROCESSING PLANTS

Descripción

PROJECT EXPERIENCE BY SECTOR

* 500 MMSCFD Gas Plant Upgrade including compression, slug catchers and condensate stabilization system.

* Managed new gas processing and fractionation Facility with 28,400 BLPD capacity - Included Refrigerated lean oil Absorption plan, turbo expander plants, end products - ethane, propane, ISO butane, butane and natural gasoline.

* Design/Management of Propane cavern storage facility for 1,333,000 Bbl of Propane - included railway, truck and pipeline facilities.

* Relocation and integration of 125 MMSCFD Turbo-Expander plant. Cryo plant required 6600 BHP of new compression.

PROJECT EXPERIENCE BY SECTOR MIDSTREAM- PIPELINES/TERMINALS

* 36" OD x 400 mile CO2 pipeline with multiple booster stations utilizing multistage horizontal centrifugal pumps.

* 20" OD x 1440 psig Oil Transportation Pipeline in 150 foot (45 meters) water depth including subsea assemblies.

* Oil Terminal upgrade for 200,000 BOPD including tanks, LACTs, Blending, and metering .

* 12" x 24 miles Gasoline Pipeline between refinery and loading terminal including truck loading racks.

* Refined Products Truck Loading rack for 150,000 BPD refinery.



Datos del Vendedor

TUBULAR KING

Miembro Gratis desde 23/01/2014

Ver Datos de Contacto

Consultar Gratis

Infocomercial no vende este artículo y no participa en ninguna negociación, venta de operaciones. Sólo se limita a la publicación de productos de sus usuarios.

Compartir en: